SWAT SOLAR POWER PLANT NOVSKA
Inženjerska geodezija
SWAT SOLAR POWER PLANT NOVSKA
Novska, Croatia
On the SWAT ENERGY Novska solar power plant construction project, geodetic works are being carried out in the capacity of contractor for geodetic services.
Project Description:
The project involves the construction of the SWAT solar power plant in Novska, which will generate electricity from renewable sources and thereby contribute to Croatia’s energy transition..
Project Objectives:
Increase the share of energy from renewable sources,
Contribute to the reduction of greenhouse gas emissions,
Strengthen the energy security and independence of the local community.
Planned Works:
Surveying geodetic bases for design purposes, surveying the actual terrain conditions, and staking out infrastructure elements. These works ensure safe and precise execution of construction activities.
Project Importance:
The solar power plant strengthens sustainable development and the economic potential of the region, while also contributing to national energy goals.